PRODUCT DETAILS
Product Introduction:
1、Economic equipment, the cost is not high, suitable for customers who do not invest much and the first time in the industry.
2、Exclusive clamping die holder double protection: first, the guide rail is equipped with safety valve value electronic components, and secondly, there is a mechanical limit block at the end of the guide rail, which can prevent the clamping arm from falling off.
3, fine processing die head internal, smooth flow channel without dead ends accumulation of material, while professional analysis software to measure the smoothness of the die head flow channel, to ensure that the two walls of the flow channel is smooth and delicate.
4、Optimized hydraulic oil circuit design, power saving, fast action, convenient parameter adjustment.
5、Variable frequency speed control extrusion motor, can adapt to the requirements of blow molding process on the screw speed change.
6、According to the product characteristics, different die heads can be set for customers to choose.
7、The K series use the central cylinder structure of the back plate, the clamping force is strong and even.
Machine operation and precautions
1、Preparation before production
1.1 Check whether there is any damage to the parts and components of the machine, whether there is any loosening of the screws, whether there is any damage to the wires and cables, or whether they have fallen off, and if there is any damage, it should be replaced or repaired in time; check whether there is any debris in the hopper of the extruder and clean it up, and then shut down the gate of the material.
1.2 Check whether the moving parts are firm, whether the screws are loose and fall off, especially where the impact is strong, and whether the belt drive part is abnormal.
1.3 Check whether the high-pressure gas source, low-pressure gas source, power supply and water source are normal.
1.4 Check whether each emergency stop switch, safety door switch, protection device detection switch is normal.
1.5 Check whether each pneumatic component is leaking air and whether the action is sensitive.
1.6 Please operate strictly according to the flow of the operation manual.
Payment Delivery
Payment Delivery
- Contract Signing: A 30% deposit is required upon signing the contract.
- Payment Before Shipment: The remaining 70% is to be paid before shipment.
Production Cycle:
- Small Machines: Approximately 40 days.
- Large Machines: Approximately 70 days.