website
Quality assurance, contact us to get a package and provide competitive prices!

One-step PTE bottle blowing machine

Unavailable
Regular price From$58,888.00 | Save From$-58,888.00 (Liquid error (sections/product-template line 182): divided by 0% off)
/

Quality Assurance
We have a dedicated quality control team and advanced testing equipment to ensure consistent product quality.

Timely Delivery
With reliable raw material suppliers and streamlined production processes, we guarantee on-time delivery.

Excellent After-Sales Service
Our team of after-sales experts provide impeccable after-sales support

Certifications
Our company has a number of authoritative certifications to ensure compliance with standards.

0

One-step PTE bottle blowing machine

One-step PTE bottle blowing machine

PRODUCT DETAILS

1、The clamping framework adopts single-crossbeam, double poles, which enlarge the space of setting mould, much easier to install mould.
2、Unique PREFILL technology and variable displacement pump pressurizing technology are applied to hydraulic system to achieve high efficiency and more reliable.
3、Specialized control system: Adapting the specified controller and software, after completion of machine's commission and parameter setting, all the settled parameters can make use of SD card for storage and re-install into other machines, it is really very convenience for function testing and after service.
4、 Energy saving: Refer to our testing result, this system can save minimum 35% of energy consumption at any machine. And also it can joint together with special boards and software installed to achieve the totally energy consumption and unit product energy consumption, and help the customers to understand the production cost.
5、Stripper station adopts long-distance digital laser sensor for detection, to protect mould safety
6、Stripper station installs light curtain, to protect personal safety.
7、Optional servo rotary, precise, long using time, easy maintenance, save energy.
8、Optional injection with all-electric way, replacing hydraulic way.
9、CE certificate.

Payment Delivery

Payment Delivery

  1. Contract Signing: A 30% deposit is required upon signing the contract.
  2. Payment Before Shipment: The remaining 70% is to be paid before shipment.

Production Cycle:

  • Small Machines: Approximately 40 days.
  • Large Machines: Approximately 70 days.

RECENTLY VIEWED PRODUCTS

Special instructions for seller
Add A Coupon

What are you looking for?

Popular Searches:  

Join Our Mailing List

Stay Informed! Monthly Tips,
Tracks and Discount.